Learning Alliance Private Limited vs. Province of Punjab
Stereo. H C J D A 38.
Judgment Sheet
IN THE LAHORE HIGH COURT AT LAHORE
JUDICIAL DEPARTMENT
WP No.18066/2014
Learning Alliance (Private) Limited etc.
Versus
Province of Punjab etc.
J U D G M E N T
Date of Hearing 10.10.2019, 18.12.2019, 25.2.2020, 4.11.2020,
26.11.2020 and 15.12.2020.
Advocates for
Petitioners:
Mr. Iftikharuddin Riaz and Mr. Imran Iqbal,
Barrister Muhammad Umar Riaz and Mr.
Waqas Umar,
Mr. Ali Sibtain Fazli, Mr. Hasham Ahmad
Khan and Mr. Esa Jalil,
Syed Ali Zafar, Ms. Mehak Zafar and Mr.
Mubashir Aslam Zar,
Mr. Nadeem ud Din Malik and Mr. Asad
Ayub,
Mr. Munawar-us-Salam and Mr. Haroon
Mumtaz,
Mian Qamar uz Zaman,
Syed Salman Haider Jafri,
Mr. Munib Iqbal, Mr. Aamir Majeed Rana and
Rana M. Wakil Khan,
Ms. Ayesha Warsi, Ms. Amna Warsi and Mr.
Sohail Asghar Chaudhary,
Dr. Ilyas Zafar,
Mr. Sultan Mahmood,
Mr. Ashraf Bhatti,
Rana Muhammad Asif,
Mr. Muhammad Baleegh uz Zaman,
Mr. Azmat Lodhi,
Mr. Muhammad Akhtar Rana,
Mian Ijaz Hussain,
Syed Shahab Qutub, Mian Tariq Hassan and
Ms. Maria Farooq,
Mr. Muhammad Shabbir Hussain and Mr.
Nadeem Shehzad,
Mr. Usman Ali Bhoon and Malik Ahsan
Mehmood,
Mr. Tahir Attique Piracha,
Chaudhary Muhammad Naseer and Ms. Samra
Malik,
WP No.18066/2014
Mr. Abid Hussain Chaudhary,
Mr. Muhammad Akram Khawaja,
Khawaja Ahmad Hassan Anwari,
Mr. Mehboob Azhar Sheikh,
Mr. Muqtedir Akhtar Shabbir and Mirza
Shahryar Beg,
Mr. Muhammad Raza Qureshi, Mr. Asad
Javed and Mr. Sikendar Abbas,
Malik Aslam Ali Saif,
Mr. Nusrat Joya,
Mian Ijaz Latif,
Chaudhary Inayat Ullah and Ms. Bushra
Inayat,
Mr. Mushtaq Ahmad Chaudhary and Ch.
Habib ur Rehman,
Mr. Hashim Sabir Raja,
Mr. Sohail Arshad,
Mr. Ghulam Abbas Tarar,
Mr. Zahir Abbas,
Mr. Khalid Khan,
Mr. Muhammad Immad Qamar,
Mr. Muhammad Adil Khokhar,
Chaudhary Tariq Mehmood,
Mr. Noor Muhammad Khan Chandia,
Mr. Waheed Afzal Malik,
Mr. Shahid Rafiq Mayo,
Mr. Talaat Farooq Sheikh,
Mr. Qamar Hayat Bhuttah,
Mr. Sheraz Khalid,
Mr. Muhammad Sohail Anjum,
Mr. Masood Sadiq,
Mr. Asad Ali Bajwa,
Mr. Muhammad Yasin Bhatti.
Advocate for
Respondents:
Mr. Akhtar Javed, Additional Advocate
General, Punjab along with Muhammad
Fahad, Litigation Officer, LG&CD
Department.
Mr. Mustafa Ramday, Ms. Nadia Hafeez, Ms.
Rabia Hassan, Mr. Saad Sibghatullah, Mr.
Asfand Mir, Mr. Waqar A. Sheikh, Syed
Muhammad Ali Mehdi Bukhari, Sahabzada
Muzaffar Ali Khan, Mr. Amir Saeed Rawn,
Mr. Ahmad Jamal, Advocates for Respondent
LDA along with Ali Nusrat, Director Town
Planning, Naveed Ahmad Bhatti, Director
(Commercial), Mehmood Ali, Muhammad
WP No.18066/2014
Haris Ali, Deputy Directors, Qasim Abbas
Bhatti, Deputy Director Law, Muhammad
Shoaib, Assistant Director.
Mr. Iftikhar Ahmad Mian, Advocate for City
District Government, Lahore.
Barrister Chaudhary Saeed H. Nangra, Sardar
M.S. Tahir and Mr. Zafar Iqbal Bhatti,
Advocate for the Respondents.
Ayesha A. Malik J : This common judgment decides upon the
issues raised in the instant Petition along with connected Petitions, as
detailed in Schedule “ A ” appended with the judgment, as all Petitions
raise common questions of law and facts. The instant Petition along
with connected petitions essentially challenge the vires of provisions
of the Lahore Development Authority Act, 1975 (“ LDA Act ”) as well
as provisions of the Lahore Development Authority Land Use Rules,
2014 (“ 2014 Rules ”) and consequently demand that notifications
seeking payment of commercialization/conversion fee be set aside.
The case of the Petitioners
2. The Petitioners before the Court are either owners or tenants of
properties who have been asked to pay conversion fee by the LDA
under the 2014 Rules for carrying out commercial activity at their
property. The Petitioners have either impugned demand notices issued
by Lahore Development Authority (“ LDA ") for payment of
conversion fee or have challenged public notices dated 28.12.2012
and 5.1.2013 issued in leading newspapers both english and urdu on
the basis of which, a list was provided of commercial areas and the
public was informed that they have seven days to have their properties
converted permanently, for commercial use after payment of
conversion fee. In some cases the Petitioners have challenged the
vires of certain provisions of the LDA Act on the ground that they do
not have the power to levy conversion fee as this power vests with the
WP No.18066/2014
Local Government and in some cases the challenge is with respect to
the authority of the LDA to demand a one time conversion fee.
3. The instant Petitioner is a school located within the Gulberg
Scheme whose contention is that they have been paying temporary
commercialization fee for the property for a long time and that there is
no basis to charge permanent commercialization fee from the
Petitioners. There are several other petitions filed by schools on the
same ground being WP Nos.12224/16, 12222/16, 12225/15, 12216/16
and 12220/16. In other cases, the Petitioners state that they are
engaged in commercial activity on commercial roads, that their
property is located in a commercial area, hence there is no reason to
convert the land usage as its usage has been declared commercial. In
this context, the relevant areas where the business of the Petitioners
are located within the Gulberg Scheme are MM Alam Road, Jail
Road, Main Boulevard Road and Zafar Ali Road amongst others. The
other locations in dispute are Iqbal Town Scheme, Multan Road,
College Road and Lawrence Road which are all declared commercial
by the LDA. In this context, the basic arguments of the Petitioners are
as follows:
(i) The Petitioners have been doing commercial business at
their properties for a long time and have been paying
commercialization fee having all requisite permissions in
place. Therefore there is no legal justification for
charging a one time conversion fee under the LDA Act
and the 2014 Rules for the purposes of carrying out
commercial activity on their properties;
(ii) The Petitioners are located on a road or segment of road
which has been declared commercial, hence there is no
legal justification for charging conversion fee as the land
usage is declared commercial. Hence the Petitioners
should not be required to pay conversion fee;
WP No.18066/2014
(iii) The Petitioners have challenged the demand for one time
conversion fee on the ground that they should be allowed
to pay annual commercialization fee and that a one time
lumpsum amount not only is financially not viable but
that no quid pro quo is offered on the basis of such a
huge amount charged by LDA;
(iv) That Sections 4, 6, 13, 14, 14A, 18, 19, 28 and 37 of the
LDA Act (“ the Challenged Provisions ”) violate Article
140A of the Constitution of Islamic Republic of Pakistan,
1973 (“ Constitution" ) which envisages a three tier
system of government being Federal, Provincial and
Local, hence are ultra vires the Constitution and should
be declared so;
(v) That the impugned sections usurps the power of the
Local Government in favour of the LDA which is not
only against the mandate of the Constitution but also
deprives the Local Government of its ability to raise
revenue to carry out its functions under the Punjab Local
Government Act, 2013;
(vi) That the quantum of the conversion fee prescribed is
arbitrary, excessive and discriminatory;
(vii) That the 2014 Rules do not prescribe the manner in
which the fee shall be charged rather a flat rate of 20% of
the commercial value of the property is the required rate
charged by the Respondents.
4. The argument essentially made by the learned counsel for the
Petitioners is that LDA does not have the power to levy or collect a
conversion fee under Section 28 of the LDA Act for land usage which
is declared commercial that is where the land usage has been declared
commercial, there is no legal basis to recover conversion fee. Further
that if at all any fee can be levied it is only to recover cost incurred for
WP No.18066/2014
conversion within a specified scheme. This requires proper disclosure
by LDA of the cost incurred and the amounts statedly to be recovered.
Hence it is argued that the conversion fee at the rate of 20% of the
commercial value of the property is arbitrary, without basis,
exorbitant and does not fall within the mandate of Section 28 of the
LDA Act. It is also argued that there is no quid pro quo offered by the
LDA for the fee they are charging. In this regard, the argument is that
in order to levy a fee quid pro quo is mandatory. Reliance is placed on
Collector of Customs and others v. Sheikh Spinning Mills ( 1999
SCMR 1402 ), Pakcom Limited and others v. Federation of Pakistan
and others ( PLD 2011 SC 44 ), Federation of Pakistan through
Secretary M/o Petroleum and Natural Resources and another v.
Durrani Ceramics and others ( 2014 SCMR 1630 ).
5. Learned counsel for the Petitioners also argued that LDA
cannot charge a one time fee for permanent conversion as that not
only goes against the quid pro quo requirement but also against the
mandate of Section 28 read with Section 31 of the LDA Act. Learned
counsel for the Petitioners also argued that the LDA Act read with the
2014 Rules seeks to vest the powers of the Local Government in a
non-elected authority which is fundamentally opposed to Article 140A
read with Article 32 of the Constitution and offends the fundamental
rights of the Petitioners. Reliance has been placed on Lahore
Development Authority through D.G. and others v. Ms. Imrana
Tiwana and others ( 2015 SCMR 1739 ) (“ Imrana Tiwana Case ”) to
urge the point that these aspects of the matter have not been
considered by the august Supreme Court of Pakistan in the said
judgment. Learned counsel further argued that Local Government is
an elected body which is responsible under the Local Government
Act, 2013 (as the relevant law at the time) to essentially develop land
use plans, classification and re-classification along with development
of markets and zoning rules while considering public transport, roads
WP No.18066/2014
and other infrastructure. In this regard, the function of the Local
Government has been handed over to the LDA which not only is
unconstitutional but deprives the Local Government from its ability to
do its functions through its elected representative as well as to raise
revenue to carry out its functions as contemplated under the Local
Government Act. Hence they argued that there is no means of
harmonizing the functions of an elected local government viz-a-viz
the impugned Sections of the LDA Act.
The case of the Respondents
6. On behalf of LDA it is argued that the vires of the sections
challenged has already been settled in the Imrana Tiwana Case
wherein it was held that these provisions being the Challenged
Provisions of the LDA Act are to be construed harmoniously with the
functions of the Local Government under the Local Government Act,
such that they are compliant with each other in furtherance of their
functions and responsibilities. It is also argued that LDA carries out
most of the development works in the Lahore Division with the help
of WASA and TEPA and that the re-classification of various different
schemes falls within the mandate of the LDA Act as well as the 2014
Rules; that the Gulberg Scheme was re-classified so as to facilitate the
inhabitants of the areas and to ensure that commercial activity was
restricted to particular zones to protect overflow issues and that the
District Planning and Design Committee, Lahore has reviewed all
recommendations made by the LDA with respect to the commercial
and frozen roads which led ultimately to the Notification of 29.6.2011
issued by the Director General, LDA; that the LDA can charge
conversion fee on the basis of Section 28 of the LDA Act read with
Rule 28 of the 2014 Rules and as such no illegality has been
committed by the LDA.
7. So far as the quid pro quo argument is concerned, it is argued
that LDA provides a large number of services for the development
WP No.18066/2014
and facilitation of its schemes, hence it can charge a one time
permanent conversion fee. In this regard, learned counsel argued that
the LDA maintains the LDA Fund and the Urban Development Fund
from which it is required to provide various different services. In this
regard, learned counsel argued that if there was no quid pro quo the
properties being used commercially or industrially would be of no use
to the Petitioners as the commercial or industrial value of the land is
on account of the services provided by LDA for that area. During the
course of arguments, learned counsel also informed the Court that the
Lahore Development Authority Land Use Rules, 2014 have been
repealed by the Lahore Development Authority Land Use Rules, 2020
(“ 2020 Rules ”) on the basis of which many of the pending Petitions
have become infructuous as the 2020 Rules have once again
introduced the concept of temporary commercialization, hence for
those Petitioners who are aggrieved by permanent conversion, the
option of availing temporary commercialization is once again
available. However, LDA's counsel requested that the matter be
decided on its merit to settle the long standing issue.
Issues before the Court
8. On the basis of the arguments made, the issue before the Court
is primarily whether the LDA can levy a conversion fee in areas
which are declared to be commercial; whether such a fee can be a one
time fee and whether the fee charged is as per the requirements of
Section 28 of the LDA Act. Also in issue are the vires of Sections 4,
6, 13, 14, 14A, 18, 19, 28 and 37 of the LDA Act with specific
reference as to whether these powers should be exercised by the Local
Government and whether the Imrana Tiwana Case considered the
issue of financial autonomy of the Local Government, particularly
with reference to the impact on revenue generation for the Local
Government viz-a-viz conversion fees.
WP No.18066/2014
The Background
9. The dispute between the parties is essentially under the 2014
Rules, on account of the changes in policy with respect to commercial
use of land and levy of fee for conversion in land use. In order to
appreciate the dispute of the Petitioners, it is necessary to understand
the changes in policies adopted by the LDA over the years with
respect to commercialization that is commercial use of land and the
levy of conversion fee along with the concept of change in land use.
10. On 26.12.1990 the Government of Punjab through the Housing,
Physical and Environmental Planning Department issued the first
commercialization policy for residential plots on the basis of which
residential property could be converted into commercial property. On
27.3.1993 the policy was revised whereby commercialization was
allowed subject to the permission granted by a committee, after due
deliberation of the roads and streets which could be converted for
commercial usage , thereby allowing residential plots to be used for
commercial purposes. As per this policy commercialization fee was
charged in lumpsum at the rate of 25% of the market value, in
advance and it required an NOC to be obtained from adjoining
properties prior to converting the land use of the property.
11. The Commercialization Rules 2001 (“ Commercialization
Rules ”) were notified for the first time on 2.7.2001 by the
Government of Punjab, Housing, Urban Development and Public
Health Engineering Department, Lahore under Section 44 of the LDA
Act and Section 43 of the Punjab Development of Cities Act, 1976.
As per these Rules, a commercialization committee could notify the
roads and streets on which commercial activity was permitted and
commercialization fee was charged at the rate of 20% of the value of
the property, based on the valuation table prepared under the Stamp
Act, 1899 or 20% of the average sale price for the preceding 12
months in case of rural areas. The Commercialization Rules provided
WP No.18066/2014
for annual commercialization as well as temporary commercialization
and also constituted a commercial committee to implement the rules.
12. On 17.3.2008 in exercise of powers under Section 44 (rule
making power) of the LDA Act, Lahore Development Authority Land
Use Conversion Rules, 2008 (“ 2008 Rules ”) were notified and the
Commercialization Rules were repealed. As per these Rules, the LDA
had to prepare List A, B, C and D which provided for the roads or
segment of roads and buildings declared commercial as well as plots
and buildings where temporary commercialization was permitted. In
terms of Rule 9 of the 2008 Rules, LDA could deem a building, plot
or land facing a commercial road as converted to commercial use after
payment of conversion fee and an occupant of a building, plot or land
facing the roads on List A could use the land for commercial use
without payment of conversion fee. It also provided for temporary
commercialization in terms of List C and D and required phasing out
of temporary commercialization of buildings in List C. Rule 18 of the
2008 Rules provided for the fee for conversion of land use when
residential or open areas were converted to commercial use. The rate
prescribed was 10% of the value of the land as per the valuation table
or the average sale price over the preceding 12 months where
valuation table was not available. Important to note that until 2008
roads declared commercial could be used for commercial purposes,
without any conversion fee.
13. The 2008 Rules were repealed vide Notification dated
10.02.2009 and the LDA Land Use (Classification, Re-classification
and Re-development), 2009 (“ 2009 Rules ”) were notified which
Rules introduced the concept of land use classification and essentially
provided for the various different land uses which were permissible or
prohibited. As per these Rules, land use was classified as residential,
commercial, industrial, peri-urban, agricultural and notified area. A
procedure was set out in Chapter III of the 2009 Rules for the
WP No.18066/2014
classification of land use and in terms of Chapter IV, land use could
be reclassified by the LDA and notified accordingly. An entire
process was set out for reclassification of land use, based on the
development and growth in the area, which required for the re-
classified scheme to be notified. Fee for land use conversion was
prescribed in Rule 55 and also provided under Rule 62 that a building,
plot or land facing the roads mentioned in List A as converted for
commercial use, however the land owners had to pay a conversion
fee.
14. Consequent to the 2009 Rules, Notification dated 5.11.2009
was issued by the LDA, which covered 58 roads and segments of
roads, which were declared as commercial, named in List A. This List
A published on 13.11.2009 provided for the names of the roads and
the segments, its starting point, its ending point with all dimensions
and also provided for the type of commercial activity allowed on
roads. Important to note that these roads were declared as permanent
for commercial use. Hence their land usage was declared to be
commercial. The LDA also provided for the list of roads, segments of
roads, which were not allowed any future or further commercial use as
List B. Some of the areas under dispute before this Court are named
roads or segments of roads provided in List A such as Jail Road, Main
Boulevard Gulberg, M.M Alam Road, Hali Road, Stadium Road,
Shahrah-e-Quaid-e-Azam Road, Mall Road and Link Road which
have been declared as commercial roads. In the same way, Model
Town Link Road, Al-Madinah Road Township, Maulana Shoukat Ali
Road, College Road and Zafar Ali Road are also listed as roads in
commercial use. This Notification was amended on 29.6.2011
published on 25.7.2011 such that List A and List B were further
amended to add roads which can and cannot be commercial in future.
15. On 1.2.2012 a Notification was issued under Rule 42 of the
2009 Rules providing for the land use reclassification plan of the
WP No.18066/2014
Gulberg Scheme as approved by the Authority as per its
reclassification plan. Rules 1 to 3 of the Notification provides as
under:-
(1) The general restrictions/terms of this re-classification scheme shall
apply on the respective roads/commercial corridors and in
Institutional Zones permitted for future commercial/institutional
use, in addition to any restrictions specifically imposed on these
roads (commercial corridors) and institutional zones.
(2) Nothing in this notification shall affect the status of a building,
plot or land, which has been converted on payment of the
conversion fee under any law for the time being in force.
(3) Subject to any legal restrictions imposed under any law for the
time being in force, an occupant of a building, plot or land may use
the building, plot or land for a purpose permitted under the Re-
classification Plan on payment of the conversion fee.
Essentially this Notification re-classified land use in the Gulberg
Scheme, as per the Reclassification Plan but importantly did not affect
the status of a building, plot or land which had been converted on
payment of conversion fee under any law. This meant that for land
use, which had been converted and conversion fee had been paid, that
property retained its converted land use. The Notification is silent so
far as the named roads in List A are concerned, which suggests that
they maintain their status of being declared commercial despite the
reclassification exercise. It also required a conversion fee be paid for
commercial use as per the re-classified plan. Hence the dispute starts
at this point when conversion fee was sought for conversion of land
use as per the re-classification of a scheme.
16. The 2009 Rules were repealed by the 2014 Rules, which
essentially maintained the same concept of classification and
reclassification of land use. Fee for conversion of land use was
prescribed in Rule 28 and Rule 31 deals with temporary
commercialization. In April 2014, LDA also notified the Master Plan
Rules, 2014 which provided for the master plans, its amendments and
provided that these rules shall prevail in the event of inconsistency
with the 2009 Rules. Some of the Petitioners before this Court have
WP No.18066/2014
relied on the LDA Integrated Master Plan for Lahore 2021 dated
6.10.2004 to show that the land use is commercial since 2004 under
the Master Plan. Most of the Petitioners before the Court are involved
in commercial activity in areas where commercial use is permissible
and they have been carrying on commercial activity by way of
permanent or annual commercialization fee under the different rules
and Notifications. Also important to note is that the LDA was given
the power to carry out land use classification and re-classification by
way of an amendment to the LDA Act by the Lahore Development
Authority (Amendment) Act XXVI of 2013 (“ 2013 Amendment ”) .
So prior to 2013, LDA could modify a scheme but change of land use,
through re-classification was specifically introduced vide the 2013
Amendment wherein Section 14 of the LDA Act provides that LDA
can notify a scheme by change of land use through classification or
reclassification or redevelopment. In the same way through the 2013
Amendment in Section 28 of the LDA Act, an amendment was made
allowing LDA to raise funds by imposing fees to meet the cost of
reclassification and conversion of any property, amongst others. Prior
to the amendment, LDA could only levy fees with the consent of the
Government and a scheme could be modified as per the prescribed
rules, in the same way as prescribed for the preparation of a scheme.
Consequently the 2013 Amendment allowed LDA to raise funds
without any approval from the Government and for reasons such as
planning, expansion, classification, re-classification which by itself is
general and means and suggests any and all functions of the LDA.
17. The Government of Punjab has now issued the 2020 Rules
under Section 44 of the LDA Act and repealed the 2014 Rules. The
2020 Rules defines commercial area and commercial use of property
and has maintained the chapter on conversion, commercialization and
permissibility fee as well as temporary commercialization.
WP No.18066/2014
18. From the aforesaid, it can be said that the Government of
Punjab and the LDA through various different policies and rules have
regulated land use, its conversion and commercial use of the land.
Over time, due to rapid development and population growth, there has
been an increase in the commercial use of property and on account of
this rapid growth reliance on the master plan eroded and instead
LDA’s land use rules governed conversion of land use. The
Government of Punjab also issued the Punjab Land Use
(Classification, Reclassification and Development) Rules, 2009 under
Section 191 of the Punjab Local Government Ordinance, 2001 for the
benefit of the Local Government which are similar to the 2014 Rules.
These Rules still exist and are to be enforced by the Local
Government to the extent of the notified controlled area which defines
their jurisdiction. Consequently what has resulted is a haphazard
manner of land use conversion and approval for commercial use of
land which then necessitated the concept of re-classification by the
LDA. This essentially meant surveying the areas and notifying new
usages as per the existing use of land in the area. Important to note is
that historically LDA has relied upon different commercialization
policies which allowed for the commercialization of properties on
temporary or annual basis subject to certain conditions. At the time
there was no land use plan guiding conversion and commercialization
policies. Reliance was made on the Master Plan of Lahore.
Commercial use of land was granted on need basis and was fairly
random. LDA then introduced Lists A to D which set out roads which
were commercial and roads which were frozen, so no further
commercial activity could take place on these roads and roads on
which temporary commercialization was allowed. The idea was to
regulate land use conversion and streamline classified land use as
declared by LDA. Ultimately through re-classification it increased the
areas where commercial activity is permissible and required a
WP No.18066/2014
conversion fee to be paid simply on account of the re-classification of
the Gulberg Scheme. Hence the conversion fee under challenge in
these cases, primarily arises on account of the re-classification
exercise. During this time, LDA has also tried to phase out temporary
commercialization, however it has not been successful in doing so.
LDA has again provided for phasing out temporary commercialization
through the 2020 Rules.
19. The shift in policies has not advanced the cause of LDA, that is
to make the process of land use conversion for commercial purposes
effective and more efficient. Under the 2008 Rules, there was no
definition given to conversion of land use and instead Rule 9 provided
for a deemed conversion status of buildings, plots or land facing a
commercial road as mentioned in List A, being the list of land
converted for commercial use. As per the 2008 Rules, an occupant of
any building, plot or land facing a commercial road as notified in List
A did not have to pay any conversion fee. Conversion fee was defined
under Rule 18 of the 2008 Rules where LDA could levy the said fee
for change of residential or open area to commercial use at the rate of
10% of the value of the commercial land. The 2009 Rules defined
commercial area under Rule 2 as well as commercial use being land
which is predominantly used for commercial purposes. Land use was
classified as per its usage introducing several categories of land use
which meant that LDA was allowing other than residential land to be
converted for commercial use or other usage. The 2014 Rules defined
land use plan as the plan that sets out land uses and defined master
plan as the traditional method for presenting land use. A detailed
process of reclassification of land use was carried out which was an
effort to keep pace with the rapid urban growth. The dispute before
the Court pertains to the fee levied on conversion of land use for
properties covered under List A. Therefore in order to appreciate the
WP No.18066/2014
case of the Petitioners, it is necessary to understand the concept of
land use and its conversion as the entire dispute is based on this.
Conversion of Land Use: The Concept
20. The LDA Act defines conversion under Section 3 of the LDA
Act to mean change in use of land from the one provided in an
approved scheme or master plan. Scheme is also defined under
Section 3(w) of the LDA Act to mean a project approved for urban
development, re-development or renewal and includes larger area
plan, areas specified and notified for specific use, traffic control plans,
classification and re-classification plans, housing scheme or zoning
scheme. Section 13 of the LDA Act requires the LDA to prepare
schemes and provides for its requirements. Section 14 of the LDA Act
provides that LDA can change the land use within a scheme through
classification or re-classification or redevelopment as per the
prescribed manner. Section 38 of the LDA Act provides that where a
property’s usage is converted to a different usage, then the one
provided under a scheme or master plan or classification it must be
with the approval of the Authority. The 2014 Rules defines
conversion of land in Rule 2(c) to mean the change in use of land or
property from the one originally provided in an approved scheme or
the master plan. Master Plan has been defined to mean the traditional
method for presenting a set of land usage, allocation and control
measures in the form of a map in graphical form and is supported by
written statement of goals and objectives, strategy, financial
implications and policies for planning and development for an area
and includes a structure plan, an outline development plan a spatial
plan, peri-urban structure plan . The relevant master plans referred to
are the Master Plan of Greater Lahore 1966, and the Lahore Integrated
Master Plan 2021. These Master Plans initially served as the
fundamental document responsible for urban planning and future
growth of Lahore. However, with time LDA relied upon its land use
WP No.18066/2014
rules and land classification and re-classification schemes as they
were based on more recent surveys and represented a more accurate
picture of land use. Land Use is classified as residential, commercial,
industrial and institutional amongst others in Chapter II of the 2014
Rules. As per the 2014 Rules, Commercial Area means an area which
is designed for commercial use as per approved scheme or master
plan, or is being used as such in the established built up area .
Commercial Use means land use which is predominantly connected
with sale and distribution of goods and services . List A means roads
or segments of roads, on which commercial use has been permitted
under the Lahore Development Authority Land Use (Classification,
Reclassification and Redevelopment) Rules, 2009 or Punjab Land Use
(Classification, Reclassification and Redevelopment) Rules, 2009 . List
B means roads or segments of roads, on which commercial use has
been prohibited under the Lahore Development Authority Land Use
(Classification, Reclassification and Redevelopment) Rules, 2009 or
Punjab Land Use (Classification, Reclassification and
Redevelopment) Rules, 2009 . The 2014 Rules prescribe the permitted
land use of commercial areas amongst other land usage. It also
requires LDA to prepare a land use classification map and prepare a
land use reclassification scheme of a project area. The intent being to
allow LDA to change land use permissibility as per the trending usage
in the project area. As per the 2014 Rules temporary
commercialization was not allowed by the LDA in areas permitted for
commercialization in the master plan, re-classified areas or areas
permitted for commercial use and roads mentioned in List A. This
means that for these given areas LDA required land usage to be
permanently converted by the owners against a one time conversion
fee.
21. So in the scheme of planning and development the master plan
sets out a general plan of the areas and their land usages. The land use
WP No.18066/2014
plan set out the overall vision of the manner in which land can or
cannot be used as it separates uses which are incompatible with each
other, so that areas are earmarked with a purpose which is conducive
to the environment and provides the required amenities for the given
land use. This was necessary as schemes like Gulberg had changed
from largely residential to permanently commercial. The land use
rules, provided for the classification of land use and allowed
conversion as per the rules. List A provided for the declared roads and
segment of roads which were commercial as it reflected the permanent
usage of the road or segment of roads. Essentially roads mentioned in
List A were declared as commercial by the LDA since 2008 on the
basis of the prevailing land use.
22. The challenge faced by the LDA through the process of
devising policies for commercialization and then conversion of land
use has been to maintain the conversion process as close to the master
plan and the land use plan devised by them. However this has not
been possible or practical as the increased pace of development put
pressure on land use for commercial purposes whereas the aspects of
planning, development and execution did not necessarily keep the
same pace. LDA then entered into a phase of reclassification of
certain areas where on the basis of the existing usage of land, they
modified the land usage and developed a new land use plan. As per
the 2014 Rules, in areas where the land use is declared as commercial,
those who were carrying on business in these areas and have paid
permanent commercialization fee or conversion fee under a previous
policy or rules were made liable to pay a one time conversion fee,
based on the reclassification of the scheme. Essentially there was no
conversion of land use, but the exercise of re-classification became
the basis of the demand for the one time fee. In the cases before the
Court, this is primarily relevant to the Gulberg Scheme. Interestingly
LDA is charging a one time conversion fee even though the status of
WP No.18066/2014
land use has not changed by way of the reclassification scheme. That
is to say the land use has not been converted as the Petitioners before
the Court are covered under List A. Hence LDA is charging
conversion fee on roads that have been declared commercial that is
where the land use is declared as commercial. LDA claims that even
though the roads have been declared commercial, the individual
properties on that road are not commercial. This logic totally defies
the concept of land use plan and land use classification as the only
objective of land use classification and land use plan is to declare
areas within which classified usage can take place. Hence there
appears to be no logic in requiring the owner to pay for conversion of
land use, as the land use has not been converted. However, in
individual cases which relate to housing schemes or areas not covered
under List A, LDA has to first ascertain whether the area is
commercial or residential and whether in fact there is any land use
conversion.
23. Land use essentially is a planning device which ensures that
individuals use their land in the interest of the environment and for the
surrounding area. The purpose of classifying land use, is to provide
the permissible limits of land usage. Conversion of land use means
that the owner of the land, takes permission to convert the land use
from that which is prescribed in the land use plan or scheme. So land
use conversion means that where the area is classified as residential or
institutional permission is sought to use the land for a different
purpose other than that prescribed. Where the land usage is as per its
classification, then there is no element of conversion involved. This is
why conversion must be as per the rules with the permission of the
Authority. In the present cases, LDA seeks to recover conversion fee,
where there is no element of conversion involved.
24. The argument given by the LDA that each individual property
is required to be converted even though it is located on a road or
WP No.18066/2014
segment of roads declared commercial (List A) is totally
misconceived, as the reason the said roads were declared commercial
in the first case is because the usage on that road was primarily
commercial, hence the road was declared permanently commercial.
This means that the land use for the area is commercial. Since the land
usage was declared on the basis of existing usage of the land, the
requirement of individual property owners to convert the land usage
of property has no basis as their property stands converted with the
declaration made by the LDA. In this regard, it is important to note
that the declaration of a road as commercial is based on the usage of
the property around that road and not per se the actual road itself.
Hence there is no justification to demand a conversion fee on
properties facing roads or segment of roads as named in List A. The
entire concept of land use conversion is based on changing the use of
land from the one provided in the scheme or master plan or land use
plan. Hence where there is no conversion in land use, a conversion fee
cannot be levied. The Petitioners have also challenged the quantum of
the fee being contrary to the requirements of Section 28 of the LDA
Act. Hence the scope and purpose to charge conversion fee is also
relevant, to decide on the basic issue.
On the issue of levy of fee for conversion of land use
25. One of the justifications that the LDA has given for charging
conversion fee is that it is responsible for preserving, protecting and
developing areas which are declared commercial for which it requires
revenue as it has to provide a large number of facilities such as roads,
parking, water, sanitation including facilities such as fire fighting
arrangements, water hydrants which are the requirements of any major
urban city today. Hence the power to levy and collect fee is co-related
to the basic function of the LDA which involves planning and
development, to improve the environment which includes aspects of
traffic, transport, water supply, sewerage, drainage, waste disposal
WP No.18066/2014
and matters connected therewith. In this context, they allege that both
services and quid pro quo are present to justify the fee. They state that
Section 28 of the LDA Act allows LDA to raise adequate funds to
meet its costs, hence conversion fee is a valid fee under the LDA Act.
26. The power to levy and collect fee is pursuant to Section 28 of
the LDA Act which reads as follow:-
28. Rates and fees.– (1) The Authority may raise adequate funds to meet
the cost of planning, expansion, execution, development, redevelopment,
maintenance, zoning, classification, reclassification, augmentation,
supervision, regulation and conversion of any property or any present and
future scheme or any part of the scheme, by imposing rates, fees,
surcharge, other charges and fines in the prescribed manner.
(1a) The Authority may, in the prescribed manner, impose
fee on change of land use owing to classification and
reclassification.
(2) The rates, fees and other charges for water supply,
sewerage and drainage schemes] shall be such as to provide
sufficient revenues
(i) to cover the operating expenses including taxes, if
any, and interest to provide adequate maintenance
and depreciation;
(ii) to meet repayments on long term indebtedness to the
extent that such repayments exceed the provision of
depreciation;
(iii) to finance the normal year to year extension of any of
such schemes and to provide a reasonable portion of
the cost of future major expansion of such schemes.
27. As per Section 28(1a) of the LDA Act, the LDA can levy a fee
on the change of land use owing to classification or re-classification,
to raise adequate funds to meet the cost of planning, expansion,
development and re-development amongst other reasons as listed in
Section 28 of the LDA Act. Section 3(k) of the LDA Act defines the
word ‘fee’ to mean an amount levied by the Authority on the land,
area, scheme or property on account of any privilege, benefit,
services, transfer of rights and interests, issuance of a licence or
permission or any cost and includes charges for provision of water
supply, construction, maintenance and network of roads, drainage,
WP No.18066/2014
sewerage and other services . So the conversion fee is for a benefit or
service or for recovering costs which includes charges for water
supply, maintenance of roads, drainage, sewerage and other services
all relevant to conversion of land use. Section 28(1) vests power in
LDA to raise adequate funds to meet the cost of conversion of any
property. Hence what is fundamental to the levy of conversion fee is
that it requires adequate funds to meet the cost of conversion .
Although LDA can raise adequate funds to meet the cost of planning,
expansion, development, maintenance, for the purposes of a
conversion fee , all amounts raised have to be adequate to meet the
cost of conversion. As per Section 3(i) conversion means change in
land use from the approved scheme or master plan. So a conversion
fee can be charged for change of land use and change of land use is on
account of the change from the classification or re-classification of a
scheme. Section 44 of the LDA Act provides for the powers to make
rules for carrying into the effect the purpose of the LDA Act. Pursuant
to these powers, the Commercialization Rules were issued vide
Notification dated 02.07.2001, the 2008 Rules, the 2009 Rules, the
2014 Rules and now the 2020 Rules. Rule 28 of the 2014 Rules
prescribes as follows:
28. Fee for conversion of land use . (1) Conversion of land use, by
preparation, amendment in the master plan, by declaration of peri-urban area
under the Lahore Development Authority Master Plan Rules 2014, and by
reclassification under Lahore Development Authority Land Use
(Classification, Reclassification and Redevelopment) Rules, 2009, Punjab
Land Use (Classification, reclassification and Redevelopment) Rules, 2009 or
under these rules, shall not entitle any person to use the land for such notified,
converted, reclassified use unless the conversion fee is paid in a manner given
hereinafter:
Land Use Rates
I. On the approved roads as
mentioned in list A of the Gazette
Notification dated 29.06.2011
20% of the commercial value of the
total area of ownership, as provided in
the valuation table.
II. Upon Re-Classification under the
Lahore Development Authority
Land Use Rules, 2009, Punjab
Land Use (Classification,
WP No.18066/2014
Reclassification and
Redevelopment) Rules 2009 or
under these rules:
a. From Peri Urban, Residential,
Agricultural Areas to
Commercial.
b. From Residential, Agricultural,
Peri Urban to Industrial,
Institutional, Intercity Service
Area.
c. From Institutional or Industrial
and Intercity Service Area to
Commercial.
a. 20% of the commercial value of the
total area of ownership, as provided
in the valuation table.
b. 10% of the commercial value of the
total area of ownership, as provided
in the valuation table.
c. 10% of the commercial value of the
total area of ownership, as provided
in the valuation table.
III. Upon Declaration of Peri-
Urban Area:
a. from agriculture area to
residential area
b. from agriculture area to
commercial area
c. from agriculture area to
Industrial, Institutional, intercity
services.
a. 5% of the residential value of the
total area of ownership, as provided
in the valuation table.
b. 20% of the commercial value of the
total area of ownership, as provided
in the valuation table
c. 10% of the commercial value of the
total area of ownership, as provided
in the valuation table
IV.On permissible uses under rule
4(b), 7(b), and 8(b)
20% of the commercial value of the
total area of ownership, as provided
In the valuation table
(2) The Authority shall not levy conversion fee for the conversion
of land use to an educational or a healthcare Institutional use if the proposed
educational Institution or healthcare institution is:
(a) owned by a philanthropic, charitable or non-profit organization;
(b) is exempt from the payment of income tax; and
(c) its audited accounts for last three years reflect that it provides
services to the needy or the poor, free of cost or on no profit basis.
(3) The Authority may allow payment of fee in four equal
quarterly installments over a period of one year. In case of default, the fee
already paid shall, subject to an opportunity of hearing, be forfeited and the
offer of commercialization shall stand withdrawn.
28. As per the 2014 Rules, conversion fee applicable to properties
located on approved roads or segments of roads was 20% of the
commercial value of the total land. Annual commercialization fee is
applicable only to properties located on non-approved roads or in
frozen zones operating prior to the 1.2.2012 Notification issued by the
Chief Metropolitan Officer, LDA, Lahore. This means that for areas
declared commercial, a permanent conversion fee has to be paid, one
WP No.18066/2014
time and for roads not declared commercial an annual fee is to be paid
on a temporary basis as the area is not declared commercial. The
question that arises is that once an area is declared commercial, how
does a one time fee raise adequate funds to meet the costs of
conversion and whether LDA is obligated to declare the costs incurred
or likely to incur in order to justify the quantum of the fee charged.
LDA has justified its fee structure for commercial use of land on
permanent basis as being a regulatory fee, a service fee and a quid pro
quo fee required for providing services both as regulator and
facilitator for the given area. They argue that fee for conversion of
land use is necessary as it is in the nature of a license granted by the
LDA to use the land for a specific purpose. Also that LDA has to
ensure that the area meets the requirements of the given land use, in
terms of facilities such as road, network, parking, traffic flow and
impact, utility services, water, sanitation, sewerage etc. Furthermore
as it is a regulatory fee, it does not require any quid pro quo and the
only test is to ascertain if there is a nexus between the fee charged and
the administrative services provided. Reliance is placed on Collector
of Customs and others v. Sheikh Spinning Mills ( 1999 SCMR 1402 ),
Seven Up Bottling Company (Pvt.) Ltd. v. Lahore Development
Authority (L.D.A.), Lahore through Managing Director, WASA and its
Deputy Director Revenue (South), WASA, Lahore Development
Authority and another ( 2003 CLC 513 ), Pakcom Limited and others
v. Federation of Pakistan and others ( PLD 2011 SC 44 ), Federation
of Pakistan through Secretary M/o Petroleum and Natural Resources
and another v. Durrani Ceramics and others ( 2014 SCMR 1630 ) and
Trade Serve International (Private) Limited and others v. Pakistan
Electronic Media Regulatory Authority and others ( PLD 2017
Lahore 563 ). From the arguments raised it appears that the fee
charged under Section 28 of the LDA Act is an all encompassing fee
to serve the purpose of revenue collection.
WP No.18066/2014
29. In the cases before the Court, land use conversion is from
residential to commercial, hence LDA seeks to levy a conversion fee
for commercial use of the land. However, where roads, buildings,
areas have been declared commercial, can it be said that a conversion
fee should be charged for the purposes of development and
maintenance of the area. Historically LDA charged a
commercialization fee for carrying out commercial activity in a
permitted area. The Commercialization Rules provided for permanent
as well as temporary commercialization fee as per the users’
requirements. In cases where permanent commercialization fee was
paid under the Commercialization Rules, the land use stands
permanently converted consequent to the said Rules. In the same way,
the 2008 and 2009 Rules declared certain roads or segments of roads
as approved for commercial use, permitting commercial activity on
those roads. With the re-classification exercise, LDA required that a
one time fee be paid for conversion of land use to commercial for all
properties including those declared commercial permanently. They
state that re-classification meant that the classifications were decided
afresh, hence the fee has to be paid. They also state that while the road
has been declared commercial the individual plots have not been
converted, hence given that it is a declared commercial area, a land
owner can convert its residential plot to commercial on payment of
conversion fee. They also argue that once this fee is paid, no further
fee will be required with respect to land use conversion. However, this
does not address the issue raised by some of the Petitioners who have
paid permanent commercialization fee under the Commercialization
Rules. Why are they required to pay any further amounts as they have
converted their land permanently prior to the re-classification scheme.
Then there are other Petitioners, who have been paying annual
commercialization fee in areas declared as commercial because the
rules at the time allowed it. These Petitioners are required to pay a one
WP No.18066/2014
time fee, in a declared area, where in fact there is no land use
conversion. Some of the Petitioners before the Court have been doing
business on these roads, by paying temporary commercialization fee
and their main grievance is that they should not have to pay a
conversion fee or in the alternate should be allowed to pay a
temporary fee at a reasonable rate. Their argument is that as the land
use has been converted by the LDA, hence there is no reason to
charge a conversion fee. This argument is supported by the 2020
Rules which allows occupants of already approved property to apply
for temporary or annual commercialization at the rate of 1.25% of the
commercial value of the land as per the prevailing valuation table.
Hence the entire case of LDA of charging a one time fee has itself
undergone a change with the 2020 Rules as the 2020 Rules again
gives land owners the option to pay annual fee in declared commercial
areas. It also totally negates the argument that the one time fee is
necessary to meet the adequate costs incurred by the LDA in
developing the area to meet the cost of conversion.
30. Important to note is that once again through the 2020 Rules
LDA has stated that temporary commercialization shall be phased out
by 30.6.2024 which means that on approved roads (List A) conversion
fee will have to be paid after 30.6.2024. Hence the basic dispute
remains that is should the Petitioners pay a conversion fee, for land
declared as commercial. In the first case, as already has been stated
once the land use has been declared by LDA, no further conversion is
required. As the only justification for the levy of the fee is revenue
collection then it is necessary to understand the purpose and manner
of revenue collection. Section 28 of the LDA Act requires LDA to
charge a fee for conversion of land use to meet the cost of
classification or re-classification and conversion . This means that
LDA can charge a fee to recover the cost it has incurred to develop an
area as per its land use. This stands to reason as the LDA is the
WP No.18066/2014
Authority responsible for planning and development in the area of the
Lahore Division by devising policies and programs for improvement
in housing, traffic, transport, education, water supply, sewerage,
drainage, sold waste disposal and connected matters. Hence it can
raise funds to meet the cost of planning. In this context, LDA is
required to execute its planning through itself and government
agencies, hence it uses the assistance of WASA and TEPA amongst
others to execute its plans. However, nothing has been argued or filed
in support of the cost incurred with reclassification or the anticipated
cost for which the one time conversion fee is being charged. Nothing
has been placed on record to show what if any, reclassification costs
were incurred, especially since many parts of Gulberg were already
classified as commercial areas under the master plan or as per List A
and List B, which means that these areas were already providing
facilities needed for a commercial area, and reclassification, at best,
necessitated enhancement of the facilities. LDA has stated that it
provides maintenance of infrastructure for the benefit of property
owners in the area which includes repair works, expanding sewerage
systems, roads, under and over passes and additional infrastructure.
They have relied on a self created document which claims to reflect
the cost incurred from 2009 to 2015 specifically on tube wells,
sewerage, water supply drains and filtration plants. They have also
relied on their own list of infrastructure development in the Gulberg
area. These documents do not detail the cost incurred or even planned.
It also does not explain the rational to pay a permanent fee for
conversion of land use which land was already converted and the re-
classification exercise has not changed the land use. Consequently
they have failed to establish the extent of the cost incurred in the re-
classification of the Gulberg Scheme or any other scheme or road and
have failed to show what further development is required on the
declared commercial roads or segments of roads for which the
WP No.18066/2014
conversion fee is required. They have also failed to justify a one time
levy and its nexus with the conversion fee.
31. It is noted that under the repealed land use rules 2008 and 2009,
LDA was required to keep a separate account for revenue collected
from conversion of land use so that the revenue is spent on
infrastructure development. LDA has not been able to show that it
ever maintained such accounts and whether revenue from conversion
fees have all been used for planning and development of the given
areas from where fees were recovered. A valid concern that arises is
that if LDA uses the conversion fee to develop a flyover or underpass
or express way in some part of Lahore, which is not relevant to the
area from where the conversion fee was recovered can that be referred
to as adequate funds to meet the cost of expansion and development in
any scheme or expansion of the scheme. As per the judgments of the
august Supreme Court of Pakistan, a fee is extracted from a specific
purpose and for providing privilege to particular individuals or a
community or a specified area. The distinction between a fee and tax
is that a tax is part of the common burden, but a fee is for a specific
purpose. So the fee will be for a specified purpose which must co-
relate to the expenses incurred. Reliance is placed on 1999 SCMR
1402 ( supra ), PLD 2011 SC 44 ( supra ) and 2014 SCMR 1630
( supra ).
32. In terms of Section 28 of the LDA Act, LDA must declare its
costs for the conversion, classification or reclassification and can then
seek to recover its costs through a conversion fee, where the land use
is converted. Whether the fee is regulatory or a license fee, it can only
be recovered for conversion purposes to meet the declared cost of
conversion. As conversion of land use is a benefit sought by the
owner, hence a conversion fee can be levied to recover costs.
Accordingly the requirement is that LDA declares its planning,
development and expansion plans with the expected costs on an
WP No.18066/2014
annual or bi-annual basis not only to meet the requirements of good
governance and transparency but also to justify the adequacy of the
costs incurred and its nexus with the fee sought to be recovered. The
fees paid under Section 28 of the LDA Act are amounts paid by the
public for purposes relevant to the public. Hence they have a right to
know where the money is being spent and what to expect from the
LDA for the fees they have paid. However, in the cases before the
Court, there has been no conversion of land use, as the roads have
already been declared commercial and there is no declaration of the
costs incurred the LDA for the fees sought to be recovered nor have
they explained where conversion amounts have been spent. As the
cases before the Court challenge specific demands for conversion fee
under the 2014 Rules, the judgment is confined to the levy under the
2014 Rules and the LDA Act.
33. The issue becomes relevant when seen in the context of the
LDA Act and the 2013 Amendment. Originally under the LDA Act,
LDA Fund was to be established and the amounts deposited in the
Fund were utilized by the Authority in connection with its functions
under the LDA Act including payment of salaries and other
emoluments. There were two heads within the Fund, Urban
Development and Environment Sanitation in which amounts including
collection from fees, rates and charges would be credited separately.
With the 2013 Amendment, Section 27 was amended and 27(3) was
inserted which provided that the LDA Fund shall be credited with all
stated amounts including fees, rates and charges received by the
Authority and that all these amounts with respect to services related to
water supply, sewerage and drainage shall be credited in water supply
and sanitation head and all other amounts under the Urban
Development head. The amounts used under the water supply and
sanitation head are to be used exclusively for the purposes of water
supply and sanitation, sewerage and drainage and urban development
WP No.18066/2014
to be used towards development of infrastructure. Similarly Section
28 was amended which allowed the Authority to raise funds to meet
the cost of planning, expansion, execution development, re-
development, maintenance, zoning, classification, re-classification,
augmentation, supervision, regulation and conversion of property
presently or need in future scheme and further LDA was allowed to
impose a fee on change of land use owing to classification or re-
classification. Under the original LDA Act, all rates and fees were to
be charged with the consent of the Government and these rates, fees
and charges were imposed to cover operating expenses, repayment
and finance of any scheme or to provide for future expansion of a
scheme. The 2013 Amendment allows LDA to generate revenue
through conversion fee without any government control. It also
enables LDA to charge conversion fee after completing the re-
classification process, even though the land use did not change. This
means that in areas declared commercial land owners are made liable
to pay conversion fee, simply on account of the reclassification
process. The net result of which is that the areas declared commercial
remain commercial. This means that essentially conversion fee has
become a major source of revenue for the LDA to pay for the various
different infrastructure projects it undertakes. So the 2013
Amendment expanded the power of the LDA to recover rates and fees
without any intervention of the Government, for a wide variety of
reasons without actually providing for any accountability in the
manner as to where the funds are used. The basis of the rates
prescribed under Rule 28 of the 2014 Rules is also not explained in
terms of costs incurred by the LDA or even in terms of adequacy. This
amount statedly is deposited in the LDA Fund and can be used for
urban development which means that its open ended and not specified
on what urban development is and how it is related to conversion of
land usage. Further that fees for water supply and sanitation works are
WP No.18066/2014
collected separately and also are a part of the cost for conversion of
land use without specifically stipulating whether the conversion fee
raised from a scheme is actually used within that particular scheme.
Hence LDA's argument that the conversion fee is used for
maintenance, development and expansion within a scheme is not
evident from the manner in which it maintains its fund or from the
manner in which it has undertaken the task of re-classification.
34. Another aspect of the matter is that even though a lot has been
said with respect to the utilization of the conversion fees for
development, expansion and maintenance, the fact that the fee is
collected one time, on a permanent basis in itself suggests that the
collected amount does not necessarily represent the cost incurred for
the purposes of development, planning or expansion or even
maintenance of any scheme. In this context, LDA was specifically
asked to explain how they have budgeted future expansion and plans
within the scheme in the context of the fee that is being charged at the
rate of 20% of the value of the property. Learned counsel for the LDA
has argued that the Gulberg Scheme is a re-classification project
where the land use was re-surveyed and re-planned to accommodate
the growing commercial activity within Gulberg which originally was
a residential area. However, given that LDA has been charging
commercialization fee since 1990 under various different rules and
polices, it does not explain the one time fee for areas already declared
commercial. LDA has not disclosed as to what the cost of conversion
has been since 2008 and how the charging of a one time fee fulfills
that mandate for all times to come. It has also been brought to the
attention of the Court that LDA charges other fees such as betterment
fee, development fee and water and sanitation fee, meaning thereby
that it is charging under different heads for specific purposes, which is
part of maintenance and development. The Lahore Development
Authority (Miscellaneous) Rules, 2014 (“ Misc. Rules 2014 ”) also sets
WP No.18066/2014
out rates, fees and charges that the Authority can levy. These are as
follows as per Rule 2 of the Misc. Rules, 2014:
Imposition of rates and fees : (1) The Authority may, by notification in the
official Gazette, levy the rates, fees, charges, surcharge, penalties or fines
in the area.
(2) In addition to rates, fees, charges, surcharge, penalties or
fines specified in the Act or any other rules, the Authority may, in
like manner, levy the following rates, fees, charges, surcharge or
fines;
(a) transfer fee;
(b) placement of documents fee;
(c) permission to mortgage fee;
(d) power of attorney fee;
(e) copying fee;
(f) processing fee;
(g) no objection certificate fee;
(h) development charges;
(i) augmentation charges;
(j) water conservancy charges;
(k) emission charges;
(l) congestion charges;
(m) toll; and
(n) parking fee.
(3) The authority may, by notification in the official Gazette,
increase or decrease the rates, fees, charges, surcharge, penalties or
fines.
(4) For purposes of assessing the increase in the value of
property for charging betterment fee in accordance with sections 23
and 24 for the Act, the approved assessor of the Authority shall
assess such increase in the value of the property.
(5) The Authority may undertake development of infrastructure
and may levy toll on such infrastructure and, for the purpose, the
Authority may, in accordance with law, enter into a joint venture or
concession agreement with private parties in accordance with law.
(6) The Authority may outsource or sublet the collection of
rates, fees, charges, surcharge, penalties or fines.
(7) Where the owner of property or person liable to pay,
defaults in payment of any rate, fee other charges, surcharge,
penalty or fine, the Authority, Director General or the person so
authorized in this regard may, subject to notice, take one or more of
the following actions;
(a) withhold the transaction of the property of such
person such as transfer or sanction of building plan
till such time as the default continues;
(b) seal the property of such person;
(c) impose surcharge on the defaulted amount at a rate
to be determined by the Authority; and
(d) declare the defaulted amount to be recoverable as
arrears of land revenue.
WP No.18066/2014
Hence LDA collects various different fees and charges like
development charges, augmentation charges which are also related to
the same purpose as planning, development and expansion of a
present or future scheme. Again I have found no explanation or
justification for the levy of conversion fee to pay for services covered
under the Misc. Rules, 2014.
35. In this context LDA supports the quantum of its fee on the
ground that it is reasonably related to the estimated cost of
expenditures incurred by the LDA and is likely to be incurred by the
LDA for providing administrative and utility services in the area.
Learned counsel argued that in terms of the case law, it is not possible
for the LDA to work out arithmetical equivalence of the amount of fee
that should be reasonably charged and the only criteria or basis is that
the fee charged should be related to the expenditure incurred. It is also
argued that LDA provides many facilities with respect to
infrastructure works, utility services, waste management and so on, on
the basis of which redevelopment schemes will require constant
upgradation over time. Hence the fee charged is neither unreasonable
nor illegal as the Petitioners have been paying temporary
commercialization fee for the same reasons. Reliance is placed on
Secunderabad Hyderabad Hotel Owners Association and others v.
Hyderabad Municipal Corporation, Hyderabad and another ( AIR
1999 SC 635 ), Shell Pakistan Limited, Karachi through Attorney v.
Capital Development Authority through Chairman and 2 others ( PLD
2015 Isl. 36 ) and Trade Serve International (Private) Limited and
others v. Pakistan Electronic Media Regulatory Authority and others
( PLD 2017 Lah. 563 ). It is also argued that quantum of fee is a policy
decision which is not subject to judicial review. Reliance is placed on
Pakcom Limited and others v. Federation of Pakistan and others
( PLD 2011 SC 44 ) and Syeda Abida Hussain Imam and others v. The
Province of Punjab through Secretary and others ( 2015 YLR 1522 ).
WP No.18066/2014
However as already reasoned above, there is no basis to justify the
rates and there is no accountability for the money collected as fee and
where it is spent. This is totally against good governance, which
requires a public body to be transparent and declare its costs and use
of the fees collected. Therefore for the fee to be levied to cover costs
under Section 28 of the LDA Act, LDA has to declare the costs, the
development and maintenance works required or undertaken to
recover the costs. In this context, Section 28 of the LDA Act cannot
be used as a ways and means of generating revenue, to undertake
projects which are made under the garb of general development and
improvement. LDA has a specific mandate to plan and coordinate
with government agencies for preparing a master plan to develop,
operate, maintain water supply, sewerage, drainage with WASA and
to plan annually for development programs and maintain planning
controls and building regulations. Hence the purpose of levying a
conversion fee has to be such that LDA fulfills its mandate and makes
the necessary disclosures and declarations. Consequently the levy of
conversion fee at the rate of 20% of the commercial value of the
property is without any justification and against the requirements of
Section 28 of the LDA Act.
On the issue of vires of the Challenged Provisions
36. LDA was established to provide a system of planning and
development to improve the quality of life in the metropolitan area of
Lahore which then became the Lahore Division. It was established to
assist the Provincial Government and prepare schemes appropriate for
urban development. The word “scheme” is defined in Section 2(w) of
the LDA Act being a project approved for urban development,
redevelopment or renewal and includes larger area plan, areas
specified and notified for specific use, traffic control plans,
classification and reclassification plans, housing scheme or zoning
scheme , therefore the Authority plans and develop schemes and then
WP No.18066/2014
implements them with the help of the government agencies. However,
all this is done in aid of the Provincial Government and not to usurp
the functions of the Local Government. This aspect was discussed by
a learned Full Bench of this Court in Ms. Imrana Tiwana etc. v.
Province of Punjab etc . ( PLD 2015 Lahore 522 ) which concluded as
follows:
95. LDA can prepare “schemes” under the LDA Act (section 13).
“Scheme” means a project approved for urban development,
redevelopment or renewal and includes larger area plan, areas
specified and notified for specific use, traffic control plans,
classification and reclassification plans, housing scheme or
zoning scheme [section 3(w)]. The schemes are prepared and
then executed by the LDA in the “Area,” which means the
Lahore Division [section 3(c )] subject to the approval of the
Government. Section 13(5) specifically provides that a
“Government Agency” (which includes a local government
[section 3(m)(ii)]) shall not prepare a planning or development
scheme within the Area except with the concurrence of LDA.
Similarly, LDA has the power to prepare housing, building
infrastructure services, commercial and semi-commercial
projects (section 13A) or do land use classification (section14),
make master plan (section 14A ), or give direction to the local
government to execute a scheme in consultation with the
Authority, or take over and maintain any of the works and
services in that area, to provide amenity in relation to the land
which in the opinion of the authority ought to be provided and to
enforce regulations on behalf of the Authority (section 15).
General power to execute Schemes (section 16). LDA can
declare any locality within an area to be controlled area and issue
such directions for the prevention of haphazard growth or
encroachments and unauthorized construction in such area
(section 18). Power to remove sources of pollution (section 20).
Imposition of betterment fee (sections 23 and 24). LDA enjoys
the power to impose rates, fees, surcharges or other charges and
fines (section 28). Extension of time and cancellation of
approved schemes (Sections 34A and 34B). Punishment for
offences (section 35). Conversion of property to different use
(section 38). LDA Act is to override other laws (section 46). All
these powers usurp the responsibilities and authorities devolved
to the local government under PLGA and offend the
constitutional mandate of Article 140A.
96. For the above reasons, the powers and functions of LDA under
sections 6, 13, 13A, 14, 15, 16, 18, 20, 23, 24, 28, 34A, 34B, 35,
38 and 46 of LDA Act, 1975 to the extent that they usurp, trump,
encroach, dilute and abridge the powers, responsibility and
authority devolved on to the elected representatives of the Local
Government System under Article 140A through PLGA are
therefore, declared ultra vires Articles 9, 14, 17 and 25 of the
Constitution and further declared to be offensive to Articles 32,
37(i) and 140A of the Constitution.
WP No.18066/2014
97. LDA, however, does continue to be a development authority of
the Provincial Government for the assistance of the Provincial
Government but it cannot assume jurisdiction or interfere in the
political, administrative and financial powers devolved on to the
local government through PLGA under Article 140A. It matters
less if LDA Act has undergone amendment after the
promulgation of PLGA. The constitutional mandate to devolve
and establish a local government system, once devolved, cannot
be usurped through subsequent collateral legislation. The
Provincial Legislature has the power to alter or withdraw the
devolved powers subject to the principles of subsidiarity and
federalism discussed above but till then the said powers are
protected under the vertical separation of powers introduced by
Article 140A of the Constitution and no provincial or federal
legislation can impair or impede the political, administrative and
financial responsibility and authority of the elected
representatives of the Local Government.
The august Supreme Court of Pakistan while hearing the appeal in the
Imrana Tiwana Case decided as follows:-
54. The Province is under an obligation under Article 140A of the
Constitution to establish, by law, a Local Government System and
to devolve political, administrative and financial responsibility on
the Local Government. Yet, in doing so it is not stripped bare of
its executive and legislative authority under Articles 137 and 142
of the Constitution. The Provincial and the Local Governments
are to act in a manner, which complements one another. The
Constitution, therefore, envisages a process of participatory
democracy, where the two governments act in harmony with one
another to develop the Province. The authority of neither destroys
the other. Article 140A cannot be used to make the provisions of
Articles 137 and 142 either subordinate to it or otiose. One
constitutional provision cannot, unless it is so specifically
provided, override another and must be harmoniously construed
together, as repeatedly held by this Court………..
55. The creation of a Local Government System, and the conferment
upon the Local Government of certain political, administrative
and financial responsibilities does not deprive the Province of
authority over its citizens and deny it all role in the progress,
prosperity and development of the Province. The creation of a
Local Government System does not spell the end of the Provincial
Government in the Province. To the contrary it strengthens the
Provincial Government by entrenching democracy at grass root
level.
56. That even after the insertion of Article 140A the Provincial
Government would continue to have the authority to enact and
amend statutes, make general or special laws with regard to
Local Government and local authorities, enlarge or diminish the
authority of Local Government and extend or curtail municipal
boundaries. This power of amendment has, however, to be
informed by the fact that if the Provincial Government oversteps
its legislative or executive authority to make the Local
WP No.18066/2014
Government powerless such exercise would fall foul of Article
140A of the Constitution. An excessive or abusive exercise of
such authority would not be countenanced by this Court. It would
be struck down.
74. The solution, therefore, lies in reading the provisions of the two
statutes in harmony. The LDA Act, 1975 is to be regarded as an
enabling statute. It allows LDA to act in support of and to
complement the Local Government in the exercise of its
functions and responsibilities. Where the Local Government is
unable to act because of a lack of resources or capacity, or where
the project is of such a nature that it spills over from the territory
of one Local Government to another or where the size of the
Project is beyond the financial capacity of the Local Government
to execute; the LDA can step in and work with the Local
Government. Economies of scale, spillovers and effectiveness
are merely illustrative of the situations in which the LDA can act
in the exercise of its functions to carry out developmental and
other work and perform its statutory functions. These are not
exhaustive. Life and time may throw up other situations and
create circumstances which may warrant LDA action to be taken
in consultation with the Local Government within the purview of
PLGA, 2013. Closing the categories today will freeze growth and
retard progress.
( emphasis added )
37. As per the Imrana Tiwana Case, the sections challenged before
this Court being 4, 6, 13, 14, 14A, 18, 19, 28 and 37 of the LDA Act
were upheld for not being ultra vires to the LDA Act or Constitution
and the Court required that a harmonious interpretation be given such
that functions of the LDA compliment and facilitate the Local
Government. During the course of arguments, a lot was said with
respect to the fact that the conversion fee collected by the LDA for
Lahore in fact disables the Local Government from collecting revenue
by way of conversion fee which revenue is relevant for the purposes
of development and maintenance of the city. It was also argued that it
impinges upon the financial autonomy of the Local Government as the
LDA is to work in aid of the Provincial Government as well as the
Local Government and cannot in fact use amounts collected under the
garb of conversion fee for undertaking large infrastructure
development projects which is the present case, as per the contention
WP No.18066/2014
of the Petitioners. However, during the course of arguments there has
been no representation from the Local Government on account of the
repeal of the Punjab Local Government Act, 2013 and the
promulgation of the Punjab Local Government Act, 2019. Therefore
this aspect of the matter has not been looked into in these cases with
the help of the Local Government, therefore this question may be
raised again in some other appropriate case by the Local Government.
For the purposes of these cases, this issue stands decided by the
august Supreme Court of Pakistan in the Imrana Tiwana Case which
declared that the Challenged Provisions are not against the mandate of
the LDA Act and the Constitution.
38. In view of the aforesaid, the instant Petition along with
connected Petitions as detailed in Schedule A, are allowed in the
following terms:-
(i) LDA cannot levy or recover conversion fee under
Section 28 of the LDA Act read with Rule 28 of the 2014
Rules from roads or segment of roads declared
commercial as per List A or otherwise converted for
commercial use. The demand for a one time conversion
fee is not justified in terms of Section 28 of the LDA Act
and is against the mandate of the LDA Act. Consequently
the demand notices raised and the public advertisement
issued in newspapers both english and urdu, cannot form
the basis to collect conversion fee from an area which is
already declared commercial;
(ii) It is clarified that for the purposes of the Petitioners
before this Court whose properties as per LDA's
understanding do not fall in List A or in an area declared
commercial or has not been declared commercial, LDA
first issue notice to the Petitioner and grant a right of
WP No.18066/2014
hearing to justify the demand for conversion fee based on
land use classification;
(iii) For the purposes of Section 28 of the LDA Act where
LDA seeks to raise adequate funds to meet the cost of
planning, expansion, execution, development, re-
development, maintenance, zoning, classification, re-
classification, augmentation, supervision, regulation and
conversion of any property in any present or future
scheme, it must declare the cost so incurred, which it
seeks to recover in the form of a fee with full disclosure
of all amounts spent on development and expansion
projects and schemes to maintain good governance and
transparency and to establish the need to meet the costs
for the fee that it has imposed;
(iv) The vires of sections challenged before this Court being
4, 6, 13, 14, 14A, 18, 19, 28 and 37 of the LDA Act have
already been upheld by the august Supreme Court of
Pakistan in the Imrana Tiwana Case, hence to this extent
prayer of the Petitioners cannot be granted.
(AYESHA A.MALIK)
JUDGE
Announced in an open Court on 30.7.2021 .
JUDGE
Approved for Reporting
JUDGE
Allah Bakhsh *